Maven provided engineering assistance on this $8.8B project in British Columbia.

Project Description and Maven’s Role

BC Hydro enlisted Maven to provide engineering assistance to the Integrated Engineering Team (IET) by reviewing historic designs and delivering a brief statement of BC Hydro design preferences. Our team reviewed the IET design work at set points in the design cycle and compared them to the in-depth User Requirement documents that were created and historic BC Hydro designs. Our responsibilities included the creation and continued maintenance of a User Requirement request database, which tracks where design changes were requested from the IET to ensure that all requests are captured and acted upon. We also attended User Requirement meetings and documented all comments and action items that needed to be brought back to the IET, among other roles.